Skip to content

Engineering Stage

ES-105 — Stage Manifest

Review the structured contract for the Design and Technical Decisions stage.

Stage Manifest
Design Contract
Next: ES-106

ES-105 Stage Manifest

Manifest purpose

This manifest is the structured contract for ES-105.

Stage identity

Field Value
Stage ID ES-105
Stage Name Design and Technical Decisions
Stage Family Construction Preparation
Stage Type Project evidence production
Estimated Effort Half day
Prerequisites ES-104 — Architecture
Previous Stage ES-104 — Architecture
Next Stage ES-106 — Implementation Readiness
Primary Output Design evidence package
Publication Status Production-ready

Stage mission

Translate architecture into concrete design decisions, interfaces, data structures, workflows, controls, and implementation-ready technical choices.

Primary engineering question

What design decisions, interfaces, data structures, workflows, and controls are required to implement the architecture responsibly?

Inputs

Input Required Source
Architecture overview Yes docs/architecture/architecture_overview.md
System context Yes docs/architecture/system_context.md
Component model Yes docs/architecture/component_model.md
Data and evidence flow Yes docs/architecture/data_and_evidence_flow.md
Quality attribute strategy Yes docs/architecture/quality_attribute_strategy.md
AI-control architecture Conditional docs/architecture/ai_control_architecture.md
Architecture decision records Yes docs/architecture/architecture_decision_records.md
Architecture review Yes docs/architecture/architecture_review.md
Architecture readiness summary Yes docs/architecture/architecture_readiness_summary.md

Outputs

Output Repository Location
Design overview docs/design/design_overview.md
Interface design docs/design/interface_design.md
Data design docs/design/data_design.md
Workflow design docs/design/workflow_design.md
Access-control design docs/design/access_control_design.md
AI interaction design docs/design/ai_interaction_design.md
Error and exception design docs/design/error_and_exception_design.md
Technical decision records docs/design/technical_decision_records.md
Design review docs/design/design_review.md
Design readiness summary docs/design/design_readiness_summary.md

Required evidence

  • architecture-to-design evidence;
  • interface evidence;
  • data design evidence;
  • workflow evidence;
  • access-control evidence;
  • AI interaction evidence where applicable;
  • error and exception evidence;
  • technical decision evidence;
  • review evidence;
  • transition evidence.

Completion criteria

ES-105 is complete when all required design artifacts exist, design traces to architecture, interfaces are clear, data structures support evidence needs, workflows are defined, access control is explicit, AI interaction is explicit or not applicable, failure behavior is defined, technical decisions are recorded, design review is complete, and ES-106 readiness is documented.

Success criteria

ES-105 succeeds when ES-106 can begin implementation readiness without guessing interfaces, data structures, workflows, access-control behavior, AI interaction rules, failure handling, or design rationale.

Risks if skipped

Skipping ES-105 may result in implementation by assumption, inconsistent component behavior, weak evidence records, access-control gaps, AI-review bypasses, failure behavior discovered too late, and testing ambiguity.

Engineering insight

The manifest preserves the stage contract so future maintainers know what ES-105 was intended to produce and protect.

Continue to ES-106

Begin Implementation Readiness after ES-105 design evidence is complete.

Continue to ES-106 →