Release Conditions¶
Example purpose¶
This artifact defines the conditions for the approved LMU internal engineering review.
The conditions prevent internal review from becoming accidental operational use.
Project¶
LMU Campus Operations and Incident Coordination Platform
Document control¶
| Field | Value |
|---|---|
| Artifact owner | LMU COICP Product Owner |
| Primary reviewers | Product Engineer, Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison |
| Status | Accepted |
| Last updated | 2026-07-06 |
| Related Engineering Stage | ES-110 — Release Readiness |
| Project workspace target | docs/project-workspace/release/release_conditions.md |
Candidate context¶
| Field | Value |
|---|---|
| Candidate | LMU-COICP-RC-001 |
| Planned deployment ID | DEP-LMU-COICP-2026-03-18-001 |
| Planned review environment | LMU-COICP Internal Engineering Review Environment |
| Planned dataset | Spring Semester Synthetic Incident Dataset |
| Planned synthetic records | 421 |
| Planned reviewer accounts | 24 |
| Planned review window | March 18–22, 2026 |
| AI Incident Summary | Disabled |
| Operational pilot | Not approved |
Conditions¶
| ID | Condition | Reason | Owner | Verification |
|---|---|---|---|---|
| RC-001 | Use Spring Semester Synthetic Incident Dataset only. | Retention and access risks remain. | Product Owner / Compliance Reviewer | Dataset review before use. |
| RC-002 | Do not use for real LMU campus incidents. | Evidence and access guardrails incomplete. | Product Owner | Release scope review. |
| RC-003 | Keep AI Incident Summary disabled. | AI workflow deferred. | AI Reviewer | AI release review. |
| RC-004 | Fix invalid status transition defect before operational pilot. | Workflow integrity risk. | Product Engineer | Retest DEF-001. |
| RC-005 | Complete access-control matrix testing before pilot. | Unauthorized access risk. | IT Security Reviewer | Retest DEF-002. |
| RC-006 | Verify evidence write failure behavior before pilot. | Auditability risk. | Architecture Review Board chair | Retest DEF-003. |
| RC-007 | Formalize emergency/prohibited category testing before pilot. | Scope and safety boundary risk. | Product Engineer / Campus Safety liaison | Retest DEF-004. |
| RC-008 | Finalize build/test command evidence before release-quality baseline. | Repeatability risk. | Product Engineer | Retest DEF-005. |
| RC-009 | Do not store production or sensitive records until retention is resolved. | Governance risk. | Compliance Reviewer | Compliance review. |
| RC-010 | Do not expand beyond 24 approved reviewer accounts without repeating readiness review. | Scope control risk. | Product Owner / IT Security Reviewer | Access review. |
Monitoring requirements¶
- Monitor internal review feedback.
- Track whether reviewers find evidence-flow or access-control issues.
- Record all defect updates.
- Record attempted use outside approved internal-review scope.
- Record evidence/state mismatch concerns.
- Record access-control bypass concerns.
- Record whether sample data begins to resemble real operational data.
- Confirm AI Incident Summary remains disabled.
- Confirm emergency-boundary scenario is not treated as normal COICP workflow.
Rollback / stop criteria¶
Stop internal review if:
- synthetic data begins to resemble real operational data;
- reviewers identify an access-control bypass;
- state changes can occur without evidence events;
- AI Incident Summary becomes enabled;
- real campus incidents are entered;
- emergency-related incidents are entered as normal pilot records;
- sensitive records are introduced;
- users expand beyond approved LMU reviewer groups;
- reviewers treat RC-001 as operational.
Post-review requirements¶
- Conduct follow-up release-readiness review after DEF-001, DEF-002, and DEF-003 are addressed.
- Update release decision record before any operational pilot.
- Update release scope if capabilities change.
- Update AI release review before enabling any AI summary feature.
- Update guardrail release review after evidence failure behavior is verified.
- Update compliance review before production or sensitive data use.
- Carry monitoring and stewardship findings into governance.
Communication requirements¶
Any communication about RC-001 must state:
- LMU internal engineering review only;
- not approved for operational pilot;
- no real campus incidents;
- Spring Semester Synthetic Incident Dataset only;
- AI Incident Summary disabled;
- open defects remain;
- follow-up release readiness review required before pilot.
Condition decision¶
The release conditions are mandatory.
Violation of these conditions should stop internal review and require release-readiness reassessment.