Skip to content

Access and Data Transition Record

LMU/COICP Example

Access and Data Transition Record Example

Confirm LMU-COICP-RC-001 reviewer account provisioning, reviewer group access, synthetic dataset loading, prohibited data controls, account counts, data counts, and transition decisions.

ES-112 Access and Data LMU Transition Controls

Example purpose

This artifact records access and data transition controls at deployment.

For LMU/COICP, access and data controls are the line between an internal engineering review and an accidental operational pilot.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner LMU IT Security Reviewer
Primary reviewers COICP Product Owner, Product Engineer, Compliance reviewer, AI reviewer
Status Accepted with approved reviewer accounts and synthetic data only
Last updated 2026-07-06
Related Engineering Stage ES-112 — Deployment and Transition
Project workspace target docs/project-workspace/deployment/access_and_data_transition_record.md

Reviewer access provisioning

Group Provisioned Accounts Approved? Notes
Campus Operations 5 Yes Intake workflow review
Facilities Coordination 3 Yes Facilities handoff review
Residence Life 3 Yes Residence-hall workflow review
Campus Safety Liaison 2 Yes Emergency-boundary review
Information Technology 4 Yes Access and deployment controls
Compliance Office 2 Yes Data and retention boundary
Architecture Review Board 4 Yes Evidence and guardrail review
AI Review 1 Yes AI-disabled status review
External / unapproved users 0 No Not allowed
Total 24

Access controls applied

  • Reviewer accounts provisioned through mock LMU reviewer directory.
  • No student accounts provisioned.
  • No faculty general-user accounts provisioned.
  • No public or external accounts provisioned.
  • No production campus operator accounts connected.
  • Access limited to internal review environment.
  • Reviewer list exported for ES-113 monitoring.

Dataset transition

Dataset Records Approved? Notes
Spring Semester Synthetic Incident Dataset 421 Yes Loaded at 08:43 CT
Synthetic review scenarios 12 Yes Includes Campus Operations, Facilities, Residence Life, Campus Safety cases
Real campus incident data 0 No Prohibited
Medical or clinical data 0 No Prohibited
Law enforcement data 0 No Prohibited
Sensitive personal data 0 No Prohibited
Production system data 0 No Prohibited

Sample scenario set

Scenario ID Scenario Primary Reviewer Group
COICP-SYN-001 Routine facilities request in Information Commons Campus Operations
COICP-SYN-118 Water leak in Damen Hall requiring Facilities handoff Campus Operations / Facilities
COICP-SYN-204 Residence hall access issue requiring Residence Life coordination Residence Life
COICP-SYN-219 HVAC outage affecting evening event setup Facilities
COICP-SYN-322 Emergency-related safety concern entered in wrong workflow Campus Safety

Prohibited data controls

  • Product owner approved dataset before load.
  • Compliance reviewer inspected dataset for real names, medical data, law enforcement details, and sensitive details.
  • Reviewers instructed not to create realistic records from memory.
  • Environment labeled as synthetic data only.
  • Any real or sensitive data entry triggers stop criteria.

Transition decision

Access and data transition is approved for internal engineering review.

It is not approved for operational pilot or real-data use.

Continue to Rollback Validation Record

Validate LMU internal-review stop, pause, access removal, sample data reset, and return-to-stage actions.

Open Rollback Validation Record →