Skip to content

Planning Review

LMU/COICP Example

Planning Review Example

Build the LMU/COICP planning baseline around concrete scenarios that flow into Architecture and later stages.

ES-103 Review Baseline Decision

Example purpose

This artifact is part of the ES-103 — Planning package for the LMU Campus Operations and Incident Coordination Platform. It keeps planning tied to realistic LMU business problems rather than generic categories.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers COICP Product Owner, Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison
Status Accepted for ES-103 planning baseline
Last updated 2026-07-06
Related Engineering Stage ES-103 — Planning
Project workspace target docs/project-workspace/planning/planning_review.md

Planning context

Field Value
Source requirements package ES-102 — Requirements and Constraints
Planning baseline produced LMU-COICP-PLAN-001
Architecture baseline expected next LMU-COICP-ARCH-001
Design baseline expected later LMU-COICP-DES-001
Implementation baseline expected later LMU-COICP-IMPL-001
Integrated baseline expected later LMU-COICP-INT-001
Release candidate expected later LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
Planned downstream synthetic records 421
Planned downstream reviewer accounts 24
Planned downstream review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Scenario coverage review

Scenario Planning Coverage Architecture Handoff
COICP-SYN-001 intake workflow work package and create evidence need create workflow and IncidentData/Evidence flow
COICP-SYN-118 handoff/evidence work package and reviewability dependency Evidence History Service and owner/handoff evidence
COICP-SYN-204 role-scope work package and denied-action risk Access Control Service and scenario-scoped role model
COICP-SYN-219 status/closure work package and invalid transition risk workflow state model and closure evidence
COICP-SYN-322 emergency-boundary work package and safety wording dependency policy layer and block/redirect flow
COICP-SYN-407 optional extension work package optional IT ownership/handoff extension

Findings

ID Finding Severity Scenario Action Owner Status
PRF-001 Scenario set is sufficient but must not expand during Architecture. Medium all Freeze six scenario threads for ES-104. Product Owner Open
PRF-002 Handoff evidence needs architecture attention. High COICP-SYN-118 Treat as primary evidence scenario. ARB chair Open
PRF-003 Role model must be scenario-scoped. High COICP-SYN-204 Carry allowed/denied action matrix into Architecture. IT security reviewer Open
PRF-004 AI must remain disabled. Medium all Record AI disabled through RC-001. AI reviewer Open
PRF-005 Emergency-boundary language requires Campus Safety review. Medium COICP-SYN-322 Carry into Design and Testing. Campus Safety liaison Open
PRF-006 Status transition table must be designed. Medium COICP-SYN-219 Carry into Design. Product Engineer Open
PRF-007 Synthetic-data cleanup remains unresolved. Medium all Carry to Operations/Governance. Compliance reviewer Open

Continue to Planning Readiness Summary

Move to the next planning artifact while preserving the same LMU scenario-driven flow.

Open Planning Readiness Summary →