ES-106 / ES-107 IDRs Decision Evidence

Example purpose

This artifact records decisions made during controlled implementation.

Implementation decisions are different from architecture decisions. They capture what the team did when design met code, constraints, uncertainty, and verification reality.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer
Status Accepted for ES-107 implementation evidence
Last updated 2026-07-06
Related Engineering Stage ES-107 — Controlled Implementation
Project workspace target docs/project-workspace/implementation/implementation_decision_records.md

Implementation context

Field Value
Source design package ES-105 Design
Implementation readiness stage ES-106 — Implementation Readiness
Controlled implementation stage ES-107 — Controlled Implementation
Implementation baseline produced LMU-COICP-IMPL-001
Integrated baseline expected next LMU-COICP-INT-001
Candidate expected after testing LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
AI Incident Summary Deferred / disabled
Operational pilot Not approved

IDR-001 — Defer AI Incident Summary Implementation from First Increment

Field Value
Status Accepted
Date ES-107 baseline
Decision Owner AI reviewer
Related Work Item IW-006
Related Design ai_interaction_design.md

Decision

Defer full AI Incident Summary implementation from the first core workflow increment while preserving data/design boundaries for later implementation.

Rationale

Core incident record, evidence event, and access-control behavior should stabilize first. Deferring AI reduces risk and prevents optional functionality from driving architecture.

Consequences

  • Core workflow can proceed.
  • AI guardrails remain documented.
  • AI Incident Summary remains disabled.
  • Later implementation must revisit AI review workflow before enabling the feature.
  • ES-108 must confirm no partial AI implementation creates official AI summary behavior.

Verification impact

ES-108 should verify that no partial AI implementation allows unreviewed AI output into official records.


IDR-002 — Treat Evidence Write Failure as Blocking for Official State Change

Field Value
Status Accepted
Date ES-107 baseline
Decision Owner COICP Product Engineer / Architecture Review Board chair
Related Work Item IW-003, IW-004, IW-007
Related Design error_and_exception_design.md; TDR-002

Decision

If required evidence event creation fails, official incident state change must fail safely or remain incomplete.

Rationale

Allowing state change without evidence undermines auditability and violates the reason COICP exists.

Consequences

  • Implementation must handle consistency carefully.
  • Error path requires testing.
  • Reviewers must inspect this behavior in ES-108.
  • ES-109 must verify the failure path.

Verification impact

ES-108 review must include evidence write failure behavior.


IDR-003 — Keep Review Package Stub Deferred Until Core Workflow Stabilizes

Field Value
Status Accepted
Date ES-107 baseline
Decision Owner COICP Product Engineer
Related Work Item IW-008
Related Design interface_design.md, data_design.md

Decision

Defer full review package implementation until core workflow and evidence behavior pass ES-108 review.

Rationale

A review package built on unstable evidence behavior would create false confidence.

Consequences

  • Integration review focuses first on evidence correctness.
  • Review/export design remains valid but is not first-increment code.
  • ES-108 should record the deferral and identify integration implications.

Verification impact

ES-108 should verify that deferred review/export does not block evaluation of core evidence behavior.


IDR-004 — Use Partial Access-Control Implementation with Explicit Review Gap

Field Value
Status Accepted with gap
Date ES-107 baseline
Decision Owner IT security reviewer
Related Work Item IW-005
Related Design access_control_design.md

Decision

Accept partial access-control implementation as ES-107 evidence only if the gap is carried to ES-108 and ES-109.

Rationale

The partial implementation is useful, but it is not sufficient for integration acceptance without focused access testing.

Consequences

  • Access-control tests become ES-108 and ES-109 focus.
  • Role definitions remain review-sensitive.
  • Integration should not treat access control as complete until tested.

Verification impact

ES-108 must include access-control review; ES-109 must include denied-action behavior and role matrix tests.

Continue to Verification Notes

Record checks performed, failures, fixes, and verification gaps.

Open Verification Notes →