Estimation Record Example

Build the LMU/COICP planning baseline around concrete scenarios that flow into Architecture and later stages.

ES-103 Estimation Planning Judgment

Example purpose

This artifact is part of the ES-103 — Planning package for the LMU Campus Operations and Incident Coordination Platform. It keeps planning tied to realistic LMU business problems rather than generic categories.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers COICP Product Owner, Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison
Status Accepted for ES-103 planning baseline
Last updated 2026-07-06
Related Engineering Stage ES-103 — Planning
Project workspace target docs/project-workspace/planning/estimation_record.md

Planning context

Field Value
Source requirements package ES-102 — Requirements and Constraints
Planning baseline produced LMU-COICP-PLAN-001
Architecture baseline expected next LMU-COICP-ARCH-001
Design baseline expected later LMU-COICP-DES-001
Implementation baseline expected later LMU-COICP-IMPL-001
Integrated baseline expected later LMU-COICP-INT-001
Release candidate expected later LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
Planned downstream synthetic records 421
Planned downstream reviewer accounts 24
Planned downstream review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Estimates

Work Package Scenario Driver Estimate Confidence Basis Uncertainty
WP-001 Scenario set baseline all 1–2 hours Medium product scope decision scenario replacement pressure
WP-002 Intake workflow planning COICP-SYN-001 1–2 hours High simple create flow required field detail
WP-003 Handoff/evidence planning COICP-SYN-118 Half day Medium evidence and owner-change complexity evidence failure behavior
WP-004 Scenario-scoped role model COICP-SYN-204 Half day Medium role matrix and denied actions access conflicts
WP-005 Status/closure planning COICP-SYN-219 1–2 hours Medium status progression and closure rationale transition table detail
WP-006 Emergency-boundary planning COICP-SYN-322 1–2 hours Medium boundary wording and safety review Campus Safety language
WP-007 Optional IT handoff extension COICP-SYN-407 30–60 minutes Medium extension decision only ITSM scope drift
WP-008 AI disablement decision all 1–2 hours High defer/disable through RC-001 future AI expectations
WP-009 Synthetic-data and retention review all Half day Medium compliance review retention uncertainty
WP-010 Reviewability planning COICP-SYN-118 1–2 hours Medium future review package input export/redaction scope
WP-011 Architecture handoff package all 1–2 hours High package synthesis dependency quality
WP-012 Internal-review operations assumptions all 1–2 hours Medium 24 reviewers, March window support expectations