Requirements Overview

LMU/COICP Example

Requirements Overview Example

Summarize how accepted LMU/COICP Vision evidence becomes a scenario-driven requirements baseline for realistic university coordination problems and later Planning, Architecture, Design, Testing, Release, Operations, Monitoring, Stewardship, and Governance.

ES-102 Overview Requirements Baseline

Example purpose

This artifact orients the ES-102 requirements package.

The baseline takes the Vision evidence and turns it into requirements for concrete LMU business problems. These scenarios become the threads that Planning estimates, Architecture models, Design specifies, Implementation builds, Testing verifies, and Governance controls.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Owner
Primary reviewers COICP Product Engineer, Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison, Facilities reviewer, Residence Life reviewer
Status Accepted for ES-102 requirements baseline
Last updated 2026-07-06
Related Engineering Stage ES-102 — Requirements and Constraints
Project workspace target docs/project-workspace/requirements/requirements_overview.md
Source stage ES-101 — Vision and Problem Definition

Requirements context

Field Value
Source vision package ES-101 — Vision and Problem Definition
Requirements baseline produced LMU-COICP-REQ-001
Planning baseline expected next LMU-COICP-PLAN-001
Architecture baseline expected later LMU-COICP-ARCH-001
Design baseline expected later LMU-COICP-DES-001
Implementation baseline expected later LMU-COICP-IMPL-001
Integrated baseline expected later LMU-COICP-INT-001
Release candidate expected later LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
Planned downstream synthetic records 421
Planned downstream reviewer accounts 24
Planned downstream review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Source Vision evidence

docs/project-workspace/vision/problem_statement.md
docs/project-workspace/vision/vision_statement.md
docs/project-workspace/vision/stakeholders.md
docs/project-workspace/vision/scope.md
docs/project-workspace/vision/assumptions.md
docs/project-workspace/vision/success_metrics.md
docs/project-workspace/vision/vision_readiness_summary.md

Scenario set selected for requirements

Scenario ID Scenario University Business Problem Requirements Role Downstream Lineage
COICP-SYN-001 Information Commons ceiling leak near public printer area Campus Operations needs a fast, reviewable way to record a facilities issue that affects a high-traffic student space. Baseline create/intake requirement. FR-001 → UC-001 → Planning WP-002 → Architecture create flow → Design IF-001/WF-001 → Testing TC-001
COICP-SYN-118 Damen Hall water leak affecting evening student event setup Campus Operations must hand off responsibility to Facilities while preserving who acted, when, and why. Primary handoff, owner-change, and evidence-history requirement. FR-002/FR-004/FR-005 → UC-002 → Planning WP-003 → Architecture evidence flow → Design IF-002/WF-002 → Testing TC-005/TC-007
COICP-SYN-204 Residence hall exterior door access issue at Mertz Hall Residence Life needs access to its assigned scenario without broad visibility into unrelated Facilities or Campus Operations records. Role-scoped access requirement. FR-006 → UC-003 → Planning WP-004 → Architecture Access Control Service → Design access matrix → Testing TC-004/TC-011
COICP-SYN-219 HVAC outage affecting three evening classrooms in Cudahy Science Facilities needs status progression and closure rationale after temporary mitigation. Status-transition and closure-rationale requirement. FR-003/FR-011 → UC-004 → Planning WP-005 → Architecture state/evidence flow → Design WF-004 → Testing TC-006
COICP-SYN-322 Emergency-related safety concern mistakenly entered as COICP item Campus Safety must ensure COICP does not become emergency dispatch or notification workflow. Scope-control and emergency-boundary requirement. FR-012/C-001 → UC-005 → Planning WP-006 → Architecture policy boundary → Design WF-005/ERR-003 → Testing TC-012
COICP-SYN-407 Wi-Fi disruption affecting scheduled class check-in in Mundelein Center Campus Operations and IT need ownership visibility without turning COICP into enterprise IT service management. Optional ownership/handoff extension and scope-boundary requirement. FR-002/FR-004/C-009 → UC-006 → Planning WP-007 → Architecture optional extension → future testing

Requirements summary

LMU/COICP must support selected non-emergency campus coordination through a shared, evidence-preserving workspace. The system must help university reviewers understand whether the platform can improve coordination around facilities, residence life, campus operations, and limited IT ownership scenarios without creating operational or compliance risk.

The baseline emphasizes:

  • realistic synthetic campus operations scenarios;
  • accountable human ownership;
  • status visibility and transition control;
  • evidence of creation, handoff, ownership change, closure, and scope warning;
  • role-scoped access for Residence Life, Facilities, Campus Operations, Campus Safety, IT, Compliance, AI, and Architecture reviewers;
  • AI Incident Summary deferred/disabled through RC-001;
  • post-incident reviewability without overbuilding export early;
  • emergency-response and sensitive-record boundaries.

Major requirement areas

Area Scenario Driver Requirement Purpose
Incident intake COICP-SYN-001 create non-emergency synthetic record with required fields and creation evidence
Ownership and handoff COICP-SYN-118 preserve responsibility transfer and next-action evidence
Status and closure COICP-SYN-219 support valid status progression and closure rationale
Role-scoped access COICP-SYN-204 allow relevant access while denying broad visibility/export
Scope and emergency boundary COICP-SYN-322 block normal incident creation for emergency-related input
Optional ownership extension COICP-SYN-407 model IT ownership without expanding into ITSM
Auditability and reviewability COICP-SYN-118 / 219 reconstruct timeline later
AI governance all scenarios keep AI disabled and future AI draft-only if ever enabled
Synthetic-data governance all scenarios use only Spring Semester Synthetic Incident Dataset

Known requirements risks

Risk Scenario Required Treatment
Requirements become generic. all Preserve COICP-SYN scenario IDs through traceability and Planning handoff.
Handoff evidence is weak. COICP-SYN-118 Require owner/status/handoff evidence and downstream evidence-failure test.
Role access is vague. COICP-SYN-204 Require scenario-scoped access rules and denied export behavior.
Status transitions are under-specified. COICP-SYN-219 Carry status table into Design.
Emergency boundary is unsafe. COICP-SYN-322 Require block/redirect behavior and Campus Safety review.
AI scope creeps into first baseline. all Defer/disable AI Incident Summary through RC-001.
Internal review is mistaken for pilot. all Maintain internal-review-only language.

Baseline decision

The requirements package may proceed as LMU-COICP-REQ-001 with open issues carried forward.

Requirements are sufficiently clear to support ES-103 Planning because they define concrete business problems, required behavior, quality targets, constraints, use cases, traceability, review findings, and unresolved decisions.

Continue to Functional Requirements