Skip to content

Milestones

LMU/COICP Example

Milestones Example

Build the LMU/COICP planning baseline around concrete scenarios that flow into Architecture and later stages.

ES-103 Milestones Readiness Points

Example purpose

This artifact is part of the ES-103 — Planning package for the LMU Campus Operations and Incident Coordination Platform. It keeps planning tied to realistic LMU business problems rather than generic categories.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers COICP Product Owner, Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison
Status Accepted for ES-103 planning baseline
Last updated 2026-07-06
Related Engineering Stage ES-103 — Planning
Project workspace target docs/project-workspace/planning/milestones.md

Planning context

Field Value
Source requirements package ES-102 — Requirements and Constraints
Planning baseline produced LMU-COICP-PLAN-001
Architecture baseline expected next LMU-COICP-ARCH-001
Design baseline expected later LMU-COICP-DES-001
Implementation baseline expected later LMU-COICP-IMPL-001
Integrated baseline expected later LMU-COICP-INT-001
Release candidate expected later LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
Planned downstream synthetic records 421
Planned downstream reviewer accounts 24
Planned downstream review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Milestone register

ID Milestone Readiness Evidence Scenario Driver Owner Status
M-001 Scenario set locked COICP-SYN-001, 118, 204, 219, 322, 407 selected and bounded all COICP Product Owner Planned
M-002 Intake/handoff planning complete COICP-SYN-001 and 118 workflow inputs documented COICP-SYN-001 / 118 COICP Product Engineer Planned
M-003 Evidence model inputs ready creation, owner change, status change, handoff, closure, and scope-warning evidence identified COICP-SYN-001 / 118 / 219 / 322 ARB chair Planned
M-004 Role-scope planning complete reviewer groups and allowed/denied actions drafted COICP-SYN-204 IT security reviewer Planned
M-005 AI disablement decision recorded AI Incident Summary deferred/disabled through RC-001 all AI reviewer / Product Owner Planned
M-006 Emergency-boundary planning complete COICP-SYN-322 block/redirect ownership assigned COICP-SYN-322 Campus Safety liaison Planned
M-007 Synthetic-data and retention boundary visible Spring Semester Synthetic Incident Dataset and retention uncertainty recorded all Compliance reviewer Planned
M-008 Internal-review assumptions documented 24 reviewer accounts, 421 records, March 18–22 review window all IT security reviewer / Product Owner Planned
M-009 Architecture handoff ready ES-104 inputs summarized and reviewed all ARB chair Planned

Continue to Roles and Responsibilities

Move to the next planning artifact while preserving the same LMU scenario-driven flow.

Open Roles and Responsibilities →