Engineering Stage

ES-110 — Release Readiness

Determine whether the verified system baseline is ready for release, limited pilot, deferral, or rejection based on evidence, risk, defects, governance concerns, and operational expectations.

Verification and Release Preparation Release Evidence Next: ES-111

ES-110 Stage Manifest

Manifest purpose

This manifest is the structured contract for ES-110.

Stage identity

Field Value
Stage ID ES-110
Stage Name Release Readiness
Stage Family Verification and Release Preparation
Stage Type Release judgment and evidence production
Estimated Effort 1–2 hours per release candidate
Prerequisites ES-109 — Testing and Verification
Previous Stage ES-109 — Testing and Verification
Next Stage ES-111 — Operational Readiness
Primary Output Release readiness evidence package
Publication Status Production-ready

Stage mission

Determine whether the verified system baseline is ready for release, limited pilot, deferral, or rejection based on evidence, risk, defects, governance concerns, and operational expectations.

Primary engineering question

Should this system baseline be released, piloted, deferred, or rejected based on the available engineering evidence and remaining risk?

Inputs

Input Required Source
Testing readiness summary Yes docs/testing/testing_readiness_summary.md
Verification matrix Yes docs/testing/verification_matrix.md
Test execution record Yes docs/testing/test_execution_record.md
Defect log Yes docs/testing/defect_log.md
Guardrail verification Yes docs/testing/guardrail_verification.md
AI verification record Conditional docs/testing/ai_verification_record.md
Regression check record Yes docs/testing/regression_check_record.md

Outputs

Output Repository Location
Release candidate summary docs/release/release_candidate_summary.md
Release evidence index docs/release/release_evidence_index.md
Defect and risk assessment docs/release/defect_and_risk_assessment.md
Guardrail release review docs/release/guardrail_release_review.md
AI release review docs/release/ai_release_review.md
Release scope docs/release/release_scope.md
Release decision record docs/release/release_decision_record.md
Release conditions docs/release/release_conditions.md
Release readiness review docs/release/release_readiness_review.md
Release readiness summary docs/release/release_readiness_summary.md

Required evidence

  • release candidate evidence;
  • evidence index;
  • defect and risk assessment;
  • guardrail release evidence;
  • AI release evidence;
  • release scope evidence;
  • release decision evidence;
  • release condition evidence;
  • release review evidence;
  • transition evidence.

Completion criteria

ES-110 is complete when the release candidate is identified, evidence is indexed, defects and risks are assessed, guardrails are reviewed, AI status is reviewed, release scope is explicit, release decision is recorded, release conditions are documented, release readiness review is complete, and ES-111 readiness is documented.

Success criteria

ES-110 succeeds when ES-111 can begin operational readiness planning without guessing what baseline is being prepared, what scope applies, what conditions exist, what risks remain, or what operations must prepare to support.

Risks if skipped

Skipping ES-110 may result in premature release, unclear pilot boundaries, unaccepted risk, unsupported operations, weak governance, and loss of accountability.

Maintenance notes

Release readiness evidence should be updated for each meaningful release candidate, pilot candidate, or operational trial candidate. A prior release readiness decision should not be reused for a materially different baseline without review.

Continue to ES-111

Begin operational readiness planning using the release scope, decision, conditions, and accepted risks from ES-110.