Skip to content

Verification Notes

LMU/COICP Example

Verification Notes Example

Record LMU/COICP implementation checks, results, evidence, failures, fixes, known verification gaps, and ES-108 review focus for LMU-COICP-IMPL-001.

ES-106 / ES-107 Verification Results

Example purpose

This artifact records verification performed during controlled implementation.

Verification notes are not a final test report. They identify what has been checked, what passed, what remains partial, and what must be reviewed during ES-108.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison
Status Accepted for ES-107 implementation evidence
Last updated 2026-07-06
Related Engineering Stage ES-107 — Controlled Implementation
Project workspace target docs/project-workspace/implementation/verification_notes.md

Implementation context

Field Value
Source design package ES-105 Design
Implementation readiness stage ES-106 — Implementation Readiness
Controlled implementation stage ES-107 — Controlled Implementation
Implementation baseline produced LMU-COICP-IMPL-001
Integrated baseline expected next LMU-COICP-INT-001
Candidate expected after testing LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Verification register

Date Work Item Check Result Evidence Notes
ES-107 baseline IW-001 IncidentRecord field inspection Pass field checklist Matches data design baseline.
ES-107 baseline IW-002 EvidenceEvent field inspection Pass field checklist Supports event type, actor, timestamp, payload.
ES-107 baseline IW-003 Create incident creates evidence event Pass / review needed workflow note Requires ES-108 review.
ES-107 baseline IW-004 Status and handoff update creates evidence Partial workflow note Status transition checks incomplete.
ES-107 baseline IW-005 Unauthorized create denied Partial access note More LMU role tests needed.
ES-107 baseline IW-006 AI Incident Summary not official Pass by deferment defer note Feature not implemented.
ES-107 baseline IW-007 Evidence write failure fails safely Pending failure-path note Must be reviewed in ES-108.
ES-107 baseline IW-007 Emergency-related workflow blocked or redirected Partial scope note Requires Campus Safety review.

Failures and fixes

Failure Work Item Fix Verified?
AI suggestion allowed create without evidence event IW-003 Rejected suggestion; preserved fail-safe expectation Yes
Access role names inconsistent across notes IW-005 Standardized to LMU reviewer-role model Partial
AI suggestion auto-saved AI summary as official IW-006 Rejected; AI feature deferred Yes
Evidence failure suggestion allowed current-state update IW-007 Rejected; evidence write failure remains blocking Pending ES-108
Emergency workflow suggestion treated emergency as normal COICP case IW-007 Rejected; emergency boundary preserved Pending Campus Safety review

Known verification gaps

  • Automated test command not finalized.
  • Access-control matrix tests incomplete.
  • Evidence write failure path requires review.
  • Status transition validation needs deeper testing.
  • Review/export behavior deferred.
  • AI-enabled path not tested because feature is deferred.
  • Concrete build/test command evidence should be added when stack is finalized.
  • Emergency-boundary behavior needs focused review.

ES-108 review focus

  • Review create incident evidence event behavior.
  • Review status update evidence behavior.
  • Review evidence write failure handling.
  • Complete access-control matrix tests.
  • Confirm AI deferral prevents official AI output.
  • Confirm scope boundary behavior for emergency-related or prohibited categories.
  • Confirm known gaps are acceptable before integration.

Continue to Implementation Risk Updates

Record new, changed, retired, and carried-forward implementation risks.

Open Implementation Risk Updates →