Record LMU/COICP ES-109 defects, severity, source tests, LMU owners, resolution approach, retest status, release-readiness implication, and whether each defect blocks pilot.

ES-109 Defects LMU Risk Evidence

Example purpose

This artifact records defects found during ES-109 testing.

A defect log is evidence that testing found meaningful problems and that unresolved risk will be visible to release-readiness reviewers.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison
Status Accepted with open defects
Last updated 2026-07-06
Related Engineering Stage ES-109 — Testing and Verification
Project workspace target docs/project-workspace/testing/defect_log.md

Testing context

Field Value
Integrated baseline under test LMU-COICP-INT-001
Candidate produced by testing LMU-COICP-RC-001
Target release posture Internal engineering review only
Planned review environment LMU-COICP Internal Engineering Review Environment
Planned dataset Spring Semester Synthetic Incident Dataset
Planned synthetic records 421
Planned reviewer accounts 24
Planned review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Defect register

ID Defect Severity Source Test LMU Owner Resolution Retest Result Pilot Impact Status
DEF-001 Invalid status transition not consistently rejected. Medium TC-006 Product Engineer Add transition validation before release readiness/pilot reconsideration. Not retested Blocks pilot Open
DEF-002 Full access-control matrix not tested. Medium TC-004, TC-011 IT security reviewer Add matrix tests for LMU reviewer and future pilot roles. Not retested Blocks real-user pilot Open
DEF-003 Evidence write failure behavior not verified. High TC-007 Architecture Review Board chair Add simulation or manual verification method. Not retested Blocks pilot Open
DEF-004 Emergency-boundary test not fully formalized. Medium TC-012 Product Engineer / Campus Safety liaison Execute focused emergency/prohibited category test. Not retested Blocks pilot Open
DEF-005 Build/test command evidence not finalized. Medium verification matrix Product Engineer Formalize commands before release-quality baseline. Not retested Blocks release-quality baseline Open

High-severity defect

DEF-003 — Evidence write failure behavior not verified

If official incident state can change when required evidence cannot be written, COICP may show operational truth without reviewable proof. ES-110 should treat this as a release blocker for operational pilot unless verified or explicitly excluded by a narrow internal-review scope.

Accepted defects / risks

None are accepted for operational pilot.

ES-110 may accept some defects only for internal engineering review under strict conditions: synthetic data, approved reviewer accounts, AI disabled, no real incidents, and explicit stop criteria.

Retest requirements

Defect Retest Requirement
DEF-001 Verify invalid transitions are rejected and state remains unchanged.
DEF-002 Execute access-control matrix across LMU reviewer and future pilot roles.
DEF-003 Simulate evidence write failure and confirm official state does not silently change.
DEF-004 Verify emergency/prohibited category attempts are blocked or redirected.
DEF-005 Run and record concrete build/test/lint commands or document example-scope exception.

Continue to Guardrail Verification

Verify whether evidence, AI, access, emergency-boundary, retention, and direct-update guardrails hold.

Open Guardrail Verification →