Post-Deployment Check

LMU/COICP Example

Post-Deployment Check Example

Confirm LMU-COICP-RC-001 post-deployment environment status, approved reviewer access, synthetic dataset load, AI-disabled configuration, smoke scenario evidence, transition communication, rollback controls, known defects, and monitoring readiness.

ES-112 Post-Deployment LMU Final Check

Example purpose

This artifact records post-deployment checks for LMU-COICP-RC-001.

Post-deployment checks confirm that deployment did not accidentally expand scope or weaken ES-110 / ES-111 controls.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers COICP Product Owner, IT security reviewer, AI reviewer, Compliance reviewer, Architecture Review Board chair
Status Continue with conditions for LMU internal engineering review
Last updated 2026-07-06
Related Engineering Stage ES-112 — Deployment and Transition
Project workspace target docs/project-workspace/deployment/post_deployment_check.md

Post-deployment checks

Check Result Evidence Notes
RC-001 available in internal review environment Pass deployment execution record Environment opened at 09:08 CT
Reviewer access limited to approved accounts Pass access transition record 24 accounts
Spring Semester Synthetic Incident Dataset loaded Pass data transition record 421 records
No production data connector enabled Pass environment readiness check Production disabled
AI Incident Summary disabled Pass AI reviewer inspection UI hidden and flag disabled
Emergency workflow integration disabled Pass Campus Safety check Boundary scenario available
Smoke scenario COICP-SYN-001 completed Pass smoke evidence note Incident and EvidenceEvent created
Transition communication delivered Pass transition communication Scope limits stated
Rollback controls validated Pass rollback validation record Access removal and dataset reset validated
Known defects visible Pass deployment notes DEF-001–DEF-005 carried forward
ES-113 monitoring ready Pass monitoring handoff Monitoring window opens Mar 18

Smoke scenario result

Field Value
Scenario COICP-SYN-001
Description Routine facilities request in Information Commons
Reviewer role Campus Operations reviewer
Result Incident created
Evidence event Created
AI summary Not available
Production data None
Notes Normal-path evidence behavior confirmed

Issues found

No new deployment issues were found.

Known unresolved issues remain:

  • DEF-001 invalid status transition validation;
  • DEF-002 access-control matrix incomplete;
  • DEF-003 evidence write failure behavior unverified;
  • DEF-004 emergency-boundary testing incomplete;
  • DEF-005 build/test command evidence incomplete.

Post-deployment decision

Continue with conditions for LMU internal engineering review only.

Post-deployment boundary

Deployment success does not approve operational pilot.

It means the internal engineering review environment is available under the established LMU controls and ready for ES-113 monitoring.

Continue to Deployment Readiness Summary

Summarize deployment evidence and hand off to LMU monitoring.

Open Deployment Readiness Summary →