ES-114 Navigation¶
Purpose¶
This page explains how to move through ES-114 and where stewardship artifacts belong.
ES-114 closes the engineering loop and prepares the next cycle. Navigation through this stage should move from operational evidence to learning, learning to ownership, ownership to next-cycle routing, and routing to lifecycle closure.
ES-114 path¶
README
↓
navigation.md
↓
engineering_context.md
↓
activities.md
↓
evidence.md
↓
outputs.md
↓
readiness_gate.md
↓
stage_manifest.md
↓
next engineering cycle
Repository areas used in this stage¶
docs/engineering/ES-114/ guidance
template-library/stewardship/ reusable stewardship templates
examples/lmu-coicp/stewardship/ completed reference examples
docs/stewardship/ project-specific stewardship evidence
What to copy¶
Copy templates from template-library/stewardship/ into docs/stewardship/, then complete them for your project.
Do not edit the original templates.
Expected project artifacts¶
docs/stewardship/post_release_learning_overview.md
docs/stewardship/operations_evidence_review.md
docs/stewardship/lessons_learned.md
docs/stewardship/incident_and_defect_learning.md
docs/stewardship/user_feedback_synthesis.md
docs/stewardship/guardrail_and_ai_learning.md
docs/stewardship/technical_debt_and_improvement_backlog.md
docs/stewardship/stewardship_plan.md
docs/stewardship/next_cycle_recommendations.md
docs/stewardship/stewardship_summary.md
Traceability expectation¶
Stewardship evidence should trace to:
- ES-113 operations monitoring summary;
- monitoring logs;
- operational events;
- incident log;
- access and data monitoring;
- guardrail monitoring;
- AI monitoring;
- user feedback;
- risk and issue updates.
Every improvement action should trace to operational evidence, engineering judgment, or explicit stakeholder need.
Working order¶
Start by establishing the learning overview. Then review operational evidence, record lessons, analyze incidents and defects, synthesize feedback, review guardrail and AI learning, create the improvement backlog, define stewardship, recommend the next cycle, and close the cycle with a stewardship summary.
Do not let lessons learned remain abstract. Every important lesson should either change the system, change the process, change the evidence model, or be explicitly accepted as no-action.
The ES-114 path converts experience into durable engineering memory.