Technical Decision Records Example

Record LMU/COICP design decisions tied to concrete scenarios, evidence behavior, AI disablement, access-control choices, review-package deferral, synthetic dataset boundary, and downstream verification implications.

ES-105 TDRs Design Decisions

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison
Status Accepted for ES-105 design baseline
Last updated 2026-07-06
Related Engineering Stage ES-105 — Design
Project workspace target docs/project-workspace/design/technical_decision_records.md

Design context

Field Value
Source architecture package ES-104 — Architecture
Design baseline produced LMU-COICP-DES-001
Implementation baseline expected next LMU-COICP-IMPL-001
Integrated baseline expected later LMU-COICP-INT-001
Release candidate expected later LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
Planned downstream synthetic records 421
Planned downstream reviewer accounts 24
Planned downstream review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

TDR-001 — Use Explicit EvidenceEvent Records for LMU Handoffs

For COICP-SYN-118 Damen Hall water leak, reviewers must reconstruct who handed the item to Facilities, when it happened, what status changed, and what rationale was provided. Therefore, creation, status changes, owner changes, handoffs, closure, and scope warnings use explicit EvidenceEvent records.

TDR-002 — Treat Evidence Write Failure as Blocking

If Facilities closes COICP-SYN-219 Cudahy Science HVAC outage without a closure evidence event, the system would show a current state that cannot be defended later. Required evidence write failure therefore blocks official state change. This maps to DEF-003 if not verified.

TDR-003 — Defer and Disable AI Incident Summary for RC-001

AI Incident Summary remains disabled through RC-001 because core incident workflow, evidence behavior, access-control checks, and emergency-boundary behavior must be proven first. Release and governance must block AI activation without a future readiness cycle.

TDR-004 — Use Scenario-Scoped Role-Based Access

A Residence Life reviewer may review COICP-SYN-204 Mertz Hall door access issue, but cannot export the full review package or modify unrelated Facilities scenarios. This maps to DEF-002 if access matrix testing is incomplete.

COICP-SYN-322 is blocked or redirected to existing emergency procedures. COICP is not emergency dispatch, emergency notification, or real-time safety response.

TDR-006 — Defer Full Review Package Export Until Evidence Behavior Stabilizes

The review package for COICP-SYN-118 is only valuable if the evidence timeline is trustworthy. Full export may be deferred until core evidence behavior is stable.

Continue to Design Review