Integration Example¶
Purpose¶
This section contains the completed ES-108 — Integration example for the LMU Campus Operations and Incident Coordination Platform.
This package is the integration record for LMU-COICP-INT-001, the shared baseline created from the first controlled implementation increment. It does not approve release or pilot. It decides whether the implementation increment is traceable, reviewed, guarded, and stable enough to hand to ES-109 Testing and Verification.
Integration context¶
| Field | Value |
|---|---|
| Integrated baseline | LMU-COICP-INT-001 |
| Candidate expected after testing | LMU-COICP-RC-001 |
| Integration decision posture | Accepted with follow-up |
| Target testing posture | Internal engineering review candidate only |
| Planned review environment | LMU-COICP Internal Engineering Review Environment |
| Planned dataset for downstream review | Spring Semester Synthetic Incident Dataset |
| Planned synthetic records | 421 |
| Planned reviewer accounts | 24 |
| Planned review window | March 18–22, 2026 |
| AI Incident Summary | Deferred / disabled |
| Operational pilot | Not approved |
Integrated baseline¶
LMU-COICP-INT-001 includes:
IncidentRecordentity;EvidenceEvententity;- create synthetic incident workflow;
- partial status and handoff update workflow;
- basic access-control checks;
- initial validation and error behavior;
- AI Incident Summary deferment;
- no operational pilot capability;
- no real incident workflow.
Recommended workflow¶
Code Review Overview
↓
Pull Request Review Record
↓
Traceability Review
↓
AI Implementation Review
↓
Guardrail Review
↓
Integration Plan
↓
Integration Verification Record
↓
Review Findings
↓
Integration Decision Record
↓
Integration Readiness Summary
↓
ES-109 Testing and Verification
Repository location¶
docs/examples/lmu-coicp/integration/
In a project workspace, the comparable evidence would normally live under:
docs/project-workspace/integration/
Example set¶
Code Review Overview
Define the LMU integration review scope, branches, reviewed work items, and risks.
02Pull Request Review Record
Record PR review evidence, reviewers, checks, comments, and follow-up.
03Traceability Review
Confirm implementation changes trace to requirements, design, work items, and evidence.
04AI Implementation Review
Review AI-assisted engineering, rejected AI shortcuts, and human verification.
05Guardrail Review
Check evidence, access, AI, emergency-boundary, retention, and direct-update guardrails.
06Integration Plan
Define controlled merge order, pre-merge checks, post-merge checks, rollback, and risks.
07Integration Verification Record
Record integration verification results, conditional checks, and remaining gaps.
08Review Findings
Record findings that become DEF-001 through DEF-005 in testing.
09Integration Decision Record
Record the integration decision, risks accepted, and ES-109 testing handoff.
10Integration Readiness Summary
Summarize readiness for ES-109 Testing and Verification.
Integration accepts LMU-COICP-INT-001 into the shared baseline with follow-up. It does not approve RC-001, internal review, deployment, or pilot.