Skip to content

Integration Example

LMU/COICP Example

Integration Example

Follow LMU/COICP as controlled implementation evidence becomes the integrated baseline LMU-COICP-INT-001, with PR review, traceability review, AI review, guardrail review, verification findings, decision evidence, and handoff to ES-109 testing.

ES-108 Integration Package LMU INT-001

Purpose

This section contains the completed ES-108 — Integration example for the LMU Campus Operations and Incident Coordination Platform.

This package is the integration record for LMU-COICP-INT-001, the shared baseline created from the first controlled implementation increment. It does not approve release or pilot. It decides whether the implementation increment is traceable, reviewed, guarded, and stable enough to hand to ES-109 Testing and Verification.

Integration context

Field Value
Integrated baseline LMU-COICP-INT-001
Candidate expected after testing LMU-COICP-RC-001
Integration decision posture Accepted with follow-up
Target testing posture Internal engineering review candidate only
Planned review environment LMU-COICP Internal Engineering Review Environment
Planned dataset for downstream review Spring Semester Synthetic Incident Dataset
Planned synthetic records 421
Planned reviewer accounts 24
Planned review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Integrated baseline

LMU-COICP-INT-001 includes:

  • IncidentRecord entity;
  • EvidenceEvent entity;
  • create synthetic incident workflow;
  • partial status and handoff update workflow;
  • basic access-control checks;
  • initial validation and error behavior;
  • AI Incident Summary deferment;
  • no operational pilot capability;
  • no real incident workflow.
Code Review Overview
      ↓
Pull Request Review Record
      ↓
Traceability Review
      ↓
AI Implementation Review
      ↓
Guardrail Review
      ↓
Integration Plan
      ↓
Integration Verification Record
      ↓
Review Findings
      ↓
Integration Decision Record
      ↓
Integration Readiness Summary
      ↓
ES-109 Testing and Verification

Repository location

docs/examples/lmu-coicp/integration/

In a project workspace, the comparable evidence would normally live under:

docs/project-workspace/integration/

Example set

LMU Integration Boundary

Integration accepts LMU-COICP-INT-001 into the shared baseline with follow-up. It does not approve RC-001, internal review, deployment, or pilot.

Begin with Code Review Overview

Start by reviewing the scope and objectives for the LMU core implementation increment.

Open Code Review Overview →