Use Cases

LMU/COICP Example

Use Cases Example

Describe concrete LMU/COICP workflows for Information Commons leak intake, Damen Hall Facilities handoff, Mertz Hall Residence Life access, Cudahy Science HVAC closure, emergency-boundary rejection, optional Wi-Fi ownership, AI disablement, and future reviewability.

ES-102 Use Cases Workflow Evidence

Example purpose

This artifact describes the use cases that requirements must support.

Use cases are written as realistic university workflows. They become the scenario threads that Planning estimates, Architecture models, Design specifies, Implementation builds, and Testing verifies.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Owner
Primary reviewers COICP Product Engineer, Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison, Facilities reviewer, Residence Life reviewer
Status Accepted for ES-102 requirements baseline
Last updated 2026-07-06
Related Engineering Stage ES-102 — Requirements and Constraints
Project workspace target docs/project-workspace/requirements/use_cases.md

Requirements context

Field Value
Source vision package ES-101 — Vision and Problem Definition
Requirements baseline produced LMU-COICP-REQ-001
Planning baseline expected next LMU-COICP-PLAN-001
Architecture baseline expected later LMU-COICP-ARCH-001
Design baseline expected later LMU-COICP-DES-001
Implementation baseline expected later LMU-COICP-IMPL-001
Integrated baseline expected later LMU-COICP-INT-001
Release candidate expected later LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
Planned downstream synthetic records 421
Planned downstream reviewer accounts 24
Planned downstream review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Use case summary

ID Use Case Scenario Driver Primary Actor Related Requirements
UC-001 Create Information Commons Leak Record COICP-SYN-001 Campus Operations Reviewer FR-001, FR-005, FR-006, FR-012, NFR-001
UC-002 Hand Off Damen Hall Water Leak to Facilities COICP-SYN-118 Campus Operations Reviewer / Facilities Reviewer FR-002, FR-003, FR-004, FR-005, NFR-001, NFR-008
UC-003 Review Mertz Hall Residence Access Scenario with Scoped Access COICP-SYN-204 Residence Life Reviewer FR-006, NFR-002, NFR-006
UC-004 Close Cudahy Science HVAC Outage with Rationale COICP-SYN-219 Facilities Reviewer FR-003, FR-005, FR-011, NFR-005
UC-005 Block Emergency-Related Entry COICP-SYN-322 Campus Safety Liaison / Campus Operations Reviewer FR-012, C-001, C-011, NFR-011
UC-006 Track Optional Mundelein Wi-Fi Ownership Without ITSM Expansion COICP-SYN-407 Campus Operations Reviewer / IT Reviewer FR-002, FR-004, C-009
UC-007 Verify AI Incident Summary Is Disabled all scenarios AI Reviewer FR-007, NFR-010, C-003
UC-008 Review Damen Hall Handoff Evidence Timeline COICP-SYN-118 Architecture Review Board Reviewer FR-005, FR-010, NFR-008

UC-001 — Create Information Commons Leak Record

Field Value
Scenario COICP-SYN-001
Primary Actor Campus Operations Reviewer
Goal Create a reviewable synthetic record for a ceiling leak near the Information Commons public printer area.
Preconditions Reviewer account is approved; category is in synthetic dataset; AI summary disabled.
Trigger Dataset scenario appears in Campus Operations intake queue.

Main flow

  1. Campus Operations reviewer opens the internal review workspace.
  2. Reviewer selects the Information Commons ceiling leak scenario.
  3. System verifies create permission.
  4. Reviewer enters location, category, description, initial status, and initial owner.
  5. System creates LMU-INC-SYN-001.
  6. System records INCIDENT_CREATED evidence.
  7. System displays the record with AI summary unavailable.

Exception paths

  • If category is not approved, system rejects the record.
  • If input appears emergency-related, system follows UC-005.
  • If evidence cannot be written, official creation fails safely.

Evidence produced

  • IncidentRecord;
  • INCIDENT_CREATED;
  • creator;
  • timestamp;
  • initial owner;
  • initial status;
  • AI disabled status.

UC-002 — Hand Off Damen Hall Water Leak to Facilities

Field Value
Scenario COICP-SYN-118
Primary Actor Campus Operations Reviewer
Supporting Actor Facilities Reviewer
Goal Transfer responsibility to Facilities while preserving owner, status, and handoff evidence.
Preconditions Incident exists; Campus Operations can update; Facilities role exists.

Main flow

  1. Campus Operations reviewer opens LMU-INC-SYN-118.
  2. System checks update and handoff permission.
  3. Reviewer changes owner to Facilities Coordination.
  4. Reviewer changes status from Open to Assigned.
  5. Reviewer records handoff note: “Damen Hall water leak routed to Facilities for on-site assessment before evening event setup.”
  6. System records OWNER_CHANGED, STATUS_CHANGED, and HANDOFF_RECORDED.
  7. Facilities reviewer sees the assigned scenario.

Exception paths

  • If Facilities reviewer is not authorized, access is denied.
  • If evidence cannot be written, the official handoff fails safely.
  • If status transition is invalid, update is rejected.

UC-003 — Review Mertz Hall Residence Access Scenario with Scoped Access

Field Value
Scenario COICP-SYN-204
Primary Actor Residence Life Reviewer
Goal View assigned residence scenario without gaining broad incident visibility or export rights.

Main flow

  1. Residence Life reviewer opens assigned Mertz Hall exterior door access scenario.
  2. System verifies scenario-scoped access.
  3. Reviewer sees permitted incident fields.
  4. Reviewer adds an authorized note if allowed.
  5. System denies unrelated Facilities scenario access.
  6. System denies full review-package export.

Evidence produced

  • permitted view decision if configured;
  • denied export decision if configured;
  • authorized note event if note is recorded.

UC-004 — Close Cudahy Science HVAC Outage with Rationale

Field Value
Scenario COICP-SYN-219
Primary Actor Facilities Reviewer
Goal Close the HVAC outage scenario after temporary cooling or classroom mitigation is confirmed.

Main flow

  1. Facilities reviewer opens assigned HVAC scenario.
  2. System verifies close permission.
  3. Reviewer confirms current status can transition to Closed.
  4. Reviewer enters closure rationale.
  5. System records INCIDENT_CLOSED evidence.
  6. Scenario becomes available for review.

Exception paths

  • If closure rationale is missing, closure is rejected.
  • If transition is invalid, closure is rejected.
  • If evidence cannot be written, closure fails safely.

UC-005 — Block Emergency-Related Entry

Field Value
Scenario COICP-SYN-322
Primary Actor Campus Safety Liaison / Campus Operations Reviewer
Goal Prevent emergency-related input from becoming a normal COICP incident.

Main flow

  1. Reviewer enters emergency-related category or description.
  2. System identifies possible emergency-related input.
  3. System blocks normal incident creation.
  4. System displays emergency-procedure guidance.
  5. System optionally records SCOPE_WARNING.

Expected result

normal_incident_created = false

UC-006 — Track Optional Mundelein Wi-Fi Ownership Without ITSM Expansion

Field Value
Scenario COICP-SYN-407
Primary Actor Campus Operations Reviewer
Supporting Actor IT Reviewer
Goal Show ownership visibility for a classroom check-in disruption without expanding COICP into enterprise IT service management.

Main flow

  1. Campus Operations reviewer records Wi-Fi disruption scenario if included as extension.
  2. System assigns or hands off owner to IT reviewer.
  3. System records owner or handoff evidence.
  4. System preserves scope as coordination visibility only.

UC-007 — Verify AI Incident Summary Is Disabled

  1. AI reviewer inspects internal review UI or configuration.
  2. System shows AI Incident Summary disabled.
  3. No summary generation action is available.
  4. Direct invocation, if attempted, is denied.
  5. No AI draft is created.

UC-008 — Review Damen Hall Handoff Evidence Timeline

  1. Architecture Review Board reviewer opens authorized review view for COICP-SYN-118.
  2. System displays creation, owner change, status change, and handoff events.
  3. Reviewer confirms timeline is reconstructable.
  4. Reviewer records evidence gaps if any.

Continue to Traceability Matrix

Connect requirements to scenarios, use cases, verification, and downstream engineering impact.

Open Traceability Matrix →