Design Overview

LMU/COICP Example

Design Overview Example

Prepare the LMU/COICP architecture for controlled implementation by defining design priorities, LMU scenarios, implementation assumptions, risks, open questions, and baseline lineage.

ES-105 Overview LMU Design Baseline

Example purpose

This artifact orients the ES-105 design package for LMU/COICP. The design translates the accepted architecture into a buildable design for a university campus operations review baseline using named LMU synthetic scenarios, reviewer groups, evidence events, access boundaries, and controlled AI deferment.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison
Status Accepted for ES-105 design baseline
Last updated 2026-07-06
Related Engineering Stage ES-105 — Design
Project workspace target docs/project-workspace/design/design_overview.md
Source stage ES-104 — Architecture

Design context

Field Value
Source architecture package ES-104 — Architecture
Design baseline produced LMU-COICP-DES-001
Implementation baseline expected next LMU-COICP-IMPL-001
Integrated baseline expected later LMU-COICP-INT-001
Release candidate expected later LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
Planned downstream synthetic records 421
Planned downstream reviewer accounts 24
Planned downstream review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Design scenarios

Scenario ID Scenario Primary Reviewer Group Design Use
COICP-SYN-001 Information Commons ceiling leak near public printer area Campus Operations / Facilities normal create and Facilities handoff
COICP-SYN-118 Damen Hall water leak affecting evening event setup Campus Operations / Facilities handoff, owner change, evidence timeline
COICP-SYN-204 Mertz Hall exterior door access issue Residence Life / Campus Operations role-sensitive visibility and handoff
COICP-SYN-219 HVAC outage affecting three evening classrooms in Cudahy Science Facilities / Campus Operations queue priority, status update, closure rationale
COICP-SYN-322 Emergency-related safety concern mistakenly entered as COICP item Campus Safety liaison emergency-boundary block and redirection
COICP-SYN-407 Wi-Fi disruption affecting scheduled class check-in in Mundelein Center Campus Operations / IT ownership, access, evidence, review package

Design objective

Prepare LMU-COICP-DES-001 for controlled implementation by defining implementation-facing contracts, data structures, workflows, access-control behavior, AI-disabled interaction boundaries, exception handling, and technical decisions that can be tested downstream.

Design priorities

  • Make COICP-SYN-001, COICP-SYN-118, COICP-SYN-204, COICP-SYN-219, COICP-SYN-322, and COICP-SYN-407 executable as synthetic review scenarios.
  • Preserve evidence history for creation, status changes, owner changes, handoffs, closure rationale, scope warnings, and review/export access.
  • Ensure Residence Life, Facilities, Campus Safety, Compliance, IT, AI, and Architecture reviewers see only what their role permits.
  • Keep AI Incident Summary disabled and avoid any official AI-summary path.
  • Keep emergency-related incidents outside normal COICP workflow.
  • Avoid hard-coded retention rules.

Open design questions

ID Question Owner Needed By
DQ-001 What exact status transition table applies to COICP-SYN-118 and COICP-SYN-219 handoff scenarios? COICP Product Engineer / Architecture Review Board chair Implementation readiness
DQ-002 Which Spring Semester Synthetic Incident Dataset categories are allowed for RC-001? COICP Product Owner / Compliance reviewer Implementation readiness
DQ-003 Should denied access attempts for Residence Life and Facilities scenarios be stored as EvidenceEvents or security logs only? IT security reviewer / Architecture Review Board chair Implementation readiness
DQ-004 What exact warning language should appear when COICP-SYN-322 emergency-related content is entered? Campus Safety liaison Implementation readiness
DQ-005 What data cleanup procedure applies if a reviewer types real LMU incident details during internal review? Compliance reviewer Operations / governance