Skip to content

Environment Readiness Check

LMU/COICP Example

Environment Readiness Check Example

Verify the LMU Internal Engineering Review Environment before deployment, including isolation, reviewer access, synthetic dataset, AI-disabled status, emergency integration status, support contacts, stop criteria, and monitoring readiness.

ES-112 Environment LMU Readiness Check

Example purpose

This artifact records the environment readiness check for the LMU-COICP-RC-001 deployment.

The readiness check ensures the internal review environment is ready before reviewer access is granted.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers IT security reviewer, AI reviewer, Compliance reviewer, Architecture Review Board chair, Campus Safety liaison
Status Ready with conditions for LMU internal engineering review
Last updated 2026-07-06
Related Engineering Stage ES-112 — Deployment and Transition
Project workspace target docs/project-workspace/deployment/environment_readiness_check.md

Environment identity

Field Value
Environment name LMU-COICP Internal Engineering Review
Environment type Non-production internal review
Network exposure Internal reviewer access only
Production integrations Disabled
Dataset LMU-COICP-SYN-SPRING-2026
Reviewer directory Mock LMU reviewer directory
Monitoring handoff ES-113 monitoring package

Readiness checks

Check Result Evidence Notes
Environment isolated from production Pass IT environment review No production data connectors enabled
LMU-COICP-RC-001 staged Pass build artifact record Candidate available
Spring Semester Synthetic Incident Dataset approved Pass compliance review 421 synthetic records
Approved reviewer accounts prepared Pass access record 24 accounts
AI Incident Summary disabled Pass AI reviewer inspection Feature flag disabled and UI hidden
Emergency workflow integration disabled Pass Campus Safety check Existing procedures remain authoritative
Smoke scenario available Pass COICP-SYN-001 Basic intake scenario loaded
Review telemetry enabled Pass monitoring configuration ES-113 monitoring ready
Stop criteria available Pass rollback validation record Stop triggers documented
Transition communication ready Pass transition communication draft Message prepared

Conditional readiness items

Item Condition
DEF-001 status transition defect Review only; not operational pilot
DEF-002 access-control matrix gap Approved reviewer accounts only
DEF-003 evidence write failure gap No operational pilot; monitor normal evidence behavior
DEF-004 emergency-boundary gap Synthetic scenario only
DEF-005 build/test evidence gap Carry into stewardship

Readiness decision

Environment ready for LMU internal engineering review deployment only.

The environment is not ready for production, real incident use, AI-enabled use, or operational pilot.

Continue to Deployment Execution Record

Record timestamped deployment execution evidence for RC-001.

Open Deployment Execution Record →