Planning Overview

LMU/COICP Example

Planning Overview Example

Build the LMU/COICP planning baseline around concrete scenarios that flow into Architecture and later stages.

ES-103 Overview Planning Baseline

Example purpose

This artifact is part of the ES-103 — Planning package for the LMU Campus Operations and Incident Coordination Platform. It keeps planning tied to realistic LMU business problems rather than generic categories.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers COICP Product Owner, Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison
Status Accepted for ES-103 planning baseline
Last updated 2026-07-06
Related Engineering Stage ES-103 — Planning
Project workspace target docs/project-workspace/planning/planning_overview.md

Planning context

Field Value
Source requirements package ES-102 — Requirements and Constraints
Planning baseline produced LMU-COICP-PLAN-001
Architecture baseline expected next LMU-COICP-ARCH-001
Design baseline expected later LMU-COICP-DES-001
Implementation baseline expected later LMU-COICP-IMPL-001
Integrated baseline expected later LMU-COICP-INT-001
Release candidate expected later LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
Planned downstream synthetic records 421
Planned downstream reviewer accounts 24
Planned downstream review window March 18–22, 2026
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Source requirements evidence

docs/project-workspace/requirements/requirements_overview.md
docs/project-workspace/requirements/functional_requirements.md
docs/project-workspace/requirements/non_functional_requirements.md
docs/project-workspace/requirements/constraints.md
docs/project-workspace/requirements/use_cases.md
docs/project-workspace/requirements/traceability_matrix.md
docs/project-workspace/requirements/requirements_review.md
docs/project-workspace/requirements/requirements_readiness_summary.md

Scenario set selected for planning

Scenario ID Scenario Business Problem Planning Decision Needed Architecture Handoff
COICP-SYN-001 Information Commons ceiling leak near public printer area Campus Operations needs a fast, low-friction way to create a non-emergency facilities coordination record. Include as baseline create/intake scenario. Create workflow, current state, creation evidence
COICP-SYN-118 Damen Hall water leak affecting evening student event setup Campus Operations must hand off to Facilities without losing accountability or timeline evidence. Treat as primary handoff/evidence scenario. Owner change, status change, handoff evidence, future review package
COICP-SYN-204 Residence hall exterior door access issue at Mertz Hall Residence Life needs scoped visibility without broad export or unrelated incident access. Treat as access-control and role-scope scenario. Role model, protected data, denied export
COICP-SYN-219 HVAC outage affecting three evening classrooms in Cudahy Science Facilities needs status progression and closure rationale after mitigation. Treat as status-transition and closure scenario. State model, closure evidence, invalid transition risk
COICP-SYN-322 Emergency-related safety concern mistakenly entered as COICP item Campus Safety must prevent COICP from becoming emergency dispatch or notification workflow. Treat as boundary/rejection scenario. Scope check, emergency warning, blocked normal incident
COICP-SYN-407 Wi-Fi disruption affecting scheduled class check-in in Mundelein Center Campus Operations and IT need ownership visibility without turning COICP into enterprise ITSM. Treat as optional IT handoff extension. Optional owner assignment / handoff extension

Planning objective

Organize the first LMU/COICP engineering baseline around six realistic synthetic scenarios that represent the work the system must support, reject, or defer. Planning must hand Architecture a concrete scenario set and visible carry-forward issues, not generic categories.

Planning assumptions

  • The first baseline is for internal engineering review only.
  • The Spring Semester Synthetic Incident Dataset supplies the scenario set.
  • No real campus incidents are used.
  • The review environment uses 24 approved reviewer accounts.
  • AI Incident Summary is deferred/disabled through RC-001.
  • Emergency-related input must be blocked or redirected, not accepted as normal COICP workflow.
  • Role-based access must be scenario-scoped.
  • Evidence history must support later review of handoff, owner change, status change, closure, and scope-warning actions.

Continue to Work Breakdown Structure

Move to the next planning artifact while preserving the same LMU scenario-driven flow.

Open Work Breakdown Structure →