Implementation Log

LMU/COICP Example

Implementation Log Example

Record LMU/COICP implementation entries, branches, work items, source design, verification status, and controlled implementation notes for LMU-COICP-IMPL-001.

ES-106 / ES-107 Implementation Log Execution Evidence

Example purpose

This artifact records what was implemented during ES-107.

The implementation log connects work items to branches, source design, verification, status, and known notes. It is the beginning of controlled implementation evidence, not a replacement for code review or integration review.

Project

LMU Campus Operations and Incident Coordination Platform

Document control

Field Value
Artifact owner COICP Product Engineer
Primary reviewers Architecture Review Board chair, IT security reviewer, AI reviewer, Compliance reviewer, Campus Safety liaison
Status Accepted for ES-107 implementation evidence
Last updated 2026-07-06
Related Engineering Stage ES-107 — Controlled Implementation
Project workspace target docs/project-workspace/implementation/implementation_log.md

Implementation context

Field Value
Source design package ES-105 Design
Implementation readiness stage ES-106 — Implementation Readiness
Controlled implementation stage ES-107 — Controlled Implementation
Implementation baseline produced LMU-COICP-IMPL-001
Integrated baseline expected next LMU-COICP-INT-001
Candidate expected after testing LMU-COICP-RC-001
Downstream release posture Internal engineering review only
Planned downstream review environment LMU-COICP Internal Engineering Review Environment
Planned downstream dataset Spring Semester Synthetic Incident Dataset
AI Incident Summary Deferred / disabled
Operational pilot Not approved

Implementation entries

Date Work Item Branch / PR Summary Source Design Verification Status
ES-107 baseline IW-001 feature/IW-001-incident-record Implemented IncidentRecord entity fields and validation. data_design.md field inspection planned Complete
ES-107 baseline IW-002 feature/IW-002-evidence-event Implemented EvidenceEvent entity structure. data_design.md, TDR-001 field inspection planned Complete
ES-107 baseline IW-003 feature/IW-003-create-incident Implemented create synthetic incident workflow with evidence event creation. workflow_design.md, IF-001 workflow check planned Complete
ES-107 baseline IW-004 feature/IW-004-status-handoff Implemented partial status and handoff update workflow. workflow_design.md status transition checks pending Partial
ES-107 baseline IW-005 feature/IW-005-access-check Implemented basic role-based access checks for create and update actions. access_control_design.md access checks planned Partial
ES-107 baseline IW-006 feature/IW-006-ai-boundary Deferred full AI Incident Summary implementation while preserving AI guardrail. ai_interaction_design.md defer decision recorded Deferred
ES-107 baseline IW-007 feature/IW-007-error-handling Implemented partial denied, invalid, emergency, and evidence failure behavior. error_and_exception_design.md failure checks pending Partial

Notes

Implementation remained focused on core workflow and evidence behavior. AI Incident Summary remains deferred and disabled for the first implementation increment.

The most important implementation review area is consistency between IncidentRecord current state and EvidenceEvent history. Reviewers must confirm that official state changes cannot bypass evidence event creation.

Implementation discipline

  • Work items remained tied to ES-105 design artifacts.
  • Optional AI summary capability did not drive core implementation.
  • Evidence behavior was treated as a first-class implementation concern.
  • Known partial work was recorded rather than hidden.
  • Review attention was explicitly carried forward to ES-108.
  • No operational pilot behavior was implemented.